ArcGIS REST Services Directory
JSON

Layer: New Road Construction (ID:9)

View In:   Map Viewer

Name: New Road Construction

Display Field: Id

Type: Feature Layer

Geometry Type: esriGeometryPolyline

Description: <div><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;">This sub layer proposed road (polylines) construction within the Deer Creek project area, Monongahela National Forest which are required to access one or more Timber Sales timber sale areas. Roads were chosen by the North Zone silviculturist using the 2006 Monongahela National Forest Land and Resource Management Plan (Forest Plan) as a guide with an emphasis on timber management. Conventional timber sales are planned.</span></p><br /><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:700; font-style:normal; font-variant:normal; text-decoration:none;">Purpose:</span></p><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;">This data was created by the U.S. Forest Service staff for use in analysis of the project’s likely environmental impacts.</span></p><br /><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:700; font-style:normal; font-variant:normal; text-decoration:none;">Source &amp; Date:</span></p><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;">Jeff Kochendorfer, the North Zone silviculturist and Andrew Taddie, the North Zone civil engineer created the originalline work. Modifications were done by the Deer Creek interdisciplinary team. Data was downloaded from the project website ( </span><a href="https://www.fs.usda.gov/project/?project=60882" style="text-decoration:none;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#1155cc; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:underline;">https://www.fs.usda.gov/project/?project=60882</span></a><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;"> ) on 11/17/2022.</span></p><br /><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:700; font-style:normal; font-variant:normal; text-decoration:none;">Processing:</span></p><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;">ABRA symbolized the layer using the project’s scoping maps as a guide. This and other project layers were published together from ArcMap as a Feature Service.</span></p><br /><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:700; font-style:normal; font-variant:normal; text-decoration:none;">Symbology:</span></p><ul><li><p style="margin-top:0pt; margin-bottom:0pt;"><span style="font-size:11pt; font-family:Arial,sans-serif; color:#000000; background-color:transparent; font-weight:400; font-style:normal; font-variant:normal; text-decoration:none;">New Road Construction: Red dotted line</span></p></li></ul></div><div><span style="font-weight:bold;"><br /></span></div><div><span style="font-weight:bold;"><br /></span></div><div><span style="font-weight:bold;">From Original Metadata:</span><br /></div><div>DC_PropRoadConstruction - Represents proposed road (polylines) construction within the Deer Creek project area, Monongahela National Forest which are required for access one or more Timber Sales timber sale areas.Roads were chosen by the North Zone silverculturest using the 2006 Monongahela National Forest Land and Resource Management Plan (Forest Plan) as a guide with an emphisis on timber management. Conventional timber sales are planned.</div>

Copyright Text: Jeff Kochendorfer the North Zone silverculturest and Andrew Taddie North Zone civil engineer created the originalline work. Modifications were done by the Deer Creek interdisiplinary team.

Min. Scale: 500000

Max. Scale: 0

Default Visibility: true

Max Record Count: 1000

Supported query Formats: JSON, geoJSON, PBF

Use Standardized Queries: True

Extent:

Drawing Info:

HasZ: false

HasM: false

Has Attachments: false

Has Geometry Properties: true

HTML Popup Type: esriServerHTMLPopupTypeAsHTMLText

Object ID Field: OBJECTID

Unique ID Field:

Global ID Field:

Type ID Field:

Fields:
Templates:

Is Data Versioned: false

Has Contingent Values: false

Supports Rollback On Failure Parameter: true

Last Edit Date: 10/4/2023 8:22:02 PM

Schema Last Edit Date: 11/22/2022 4:33:43 PM

Data Last Edit Date: 11/22/2022 4:33:43 PM

Supported Operations:   Query   Query Pivot   Query Top Features   Query Analytic   Query Bins   Generate Renderer   Validate SQL   Get Estimates   ConvertFormat