Description: This layer was created in January 2018 by ORC and accounts for changes discussed during and after the DCC 2GP hearing (April 2017). Main changes made on the Upper Pond northern boundary, Lower pond extent, Taieri Floodway adjustement, Alluvial fans removed from south eastern side of the floodplain and around countour channel area
Copyright Text: Otago Regional Council January 2018